Giurgiu–Ruse Pipeline
   HOME

TheInfoList



OR:

The Giurgiu–Ruse pipeline will be a natural gas
pipeline Pipeline may refer to: Electronics, computers and computing * Pipeline (computing), a chain of data-processing stages or a CPU optimization found on ** Instruction pipelining, a technique for implementing instruction-level parallelism within a s ...
from
Giurgiu Giurgiu (; bg, Гюргево) is a city in southern Romania. The seat of Giurgiu County, it lies in the historical region of Muntenia. It is situated amongst mud-flats and marshes on the left bank of the Danube facing the Bulgarian city ...
in Romania to
Ruse Ruse may refer to: Places *Ruse, Bulgaria, a major city of Bulgaria **Ruse Municipality ** Ruse Province ** 19th MMC – Ruse, a constituency *Ruše, a town and municipality in north-eastern Slovenia * Ruše, Žalec, a small settlement in east-ce ...
in Bulgaria diversifying natural gas suppliers and delivery routes for the two countries and connects the two natural gas national grids. The Giurgiu–Ruse pipeline will be part of the larger
New European Transmission System The New European Transmission System (NETS) is a project to unite Central and South Eastern Europe's natural gas transmission networks by creating a common gas transmission system operator (TSO). The project is foreseen to create a sizable and eff ...
meant to unite
Central Central is an adjective usually referring to being in the center of some place or (mathematical) object. Central may also refer to: Directions and generalised locations * Central Africa, a region in the centre of Africa continent, also known as ...
and
South Eastern Europe Southeast Europe or Southeastern Europe (SEE) is a geographical subregion of Europe, consisting primarily of the Balkans. Sovereign states and territories that are included in the region are Albania, Bosnia and Herzegovina, Bulgaria, Croatia (al ...
's natural gas transmission networks. Preparations for the project started in 2010 and the intergovernmental agreement between Romania and Bulgaria was signed in November 2010. The project is developed by the consortium of two companies. The final investment decision was made at the end of 2010. The pipeline is expected to be operational by February 2012 and it will carry a minimum of 0.5 billion cubic meters and a maximum of 1.5 billion cubic meters of natural gas per year.


History

The agreement between the Romanian gas company
Transgaz Transgaz is a state-owned company, which is the technical operator of the national natural gas transmission system in Romania. The company handled in 2017 a quantity of 12.87 billion m³ of natural gas. The company has a total transport capacity ...
and Bulgarian gas company
Bulgartransgaz Bulgartransgaz EAD is a natural gas transmission and storage system operator of Bulgaria. It is a subsidiary of Bulgarian Energy Holding EAD. Bulgartransgaz was created on 15 January 2007 in Sofia. In November 2009, the Bulgarian Government de ...
was signed in November 2010. The intergovernmental agreement to build a natural gas pipeline between the two countries was also signed in November 2010 in
Ruse Ruse may refer to: Places *Ruse, Bulgaria, a major city of Bulgaria **Ruse Municipality ** Ruse Province ** 19th MMC – Ruse, a constituency *Ruše, a town and municipality in north-eastern Slovenia * Ruše, Žalec, a small settlement in east-ce ...
. The pipeline is supposed to be inaugurated in February 2012.


Technical description

The length of the Romanian section will be . The length of Bulgarian section will be . The pipeline will also have a section that will be built under the Danube river, and two natural gas measuring stations in both
Giurgiu Giurgiu (; bg, Гюргево) is a city in southern Romania. The seat of Giurgiu County, it lies in the historical region of Muntenia. It is situated amongst mud-flats and marshes on the left bank of the Danube facing the Bulgarian city ...
and
Ruse Ruse may refer to: Places *Ruse, Bulgaria, a major city of Bulgaria **Ruse Municipality ** Ruse Province ** 19th MMC – Ruse, a constituency *Ruše, a town and municipality in north-eastern Slovenia * Ruše, Žalec, a small settlement in east-ce ...
. The diameter of pipeline will be 20 in (508 mm) and the capacity will be a maximum 1.5 billion cubic meter (bcm) of natural gas per annum. The total cost of the pipeline will be around €23.8 million (US$31 million) and the construction cost will be 42.4% for the Romanian section and 57.6% for the Bulgarian section. The two sections will meet near the Bulgarian/Romanian border under the Danube river.


See also

*
Arad–Szeged pipeline The Arad–Szeged pipeline is a natural gas pipeline from Arad in Romania to Szeged in Hungary diversifying natural gas suppliers and delivery routes for the two countries and connects the two natural gas national grids. The pipeline attempts to ...


References

{{DEFAULTSORT:Giurgiu-Ruse pipeline Natural gas pipelines in Romania Natural gas pipelines in Bulgaria Bulgaria–Romania relations